Keyless Access for Versatile Storage Solutions

Quick Vault Installation Instructions

 Printable Adobe PDF version (88K)

 1. Check desired wall location for wiring and
     plumbing that could interfere Locate and
     check spacing of studs Mark studs.

 2. Measure desired height location.

 3.  Draw out level lines to cut wall
       14” wide x 12” high.

 4. Cut dry wall in between wall studs.

 5. Clean out opening of drywall dust.

 

 6.  Install shelf at desired height,
     check to be sure it does not interfere
     with lock opening.

 7. Slide Quick Vault into cut out.

 8. Pull back interior felt lining inside
     Quick Vault to locate installation holes,
     there are 2 on each side, on the hinge
     side the holes are toward the front,
     and are not threaded.

 9. Pre-drill holes into studs for screws.
     Fasten lag screws through Vault into
     stud, minimum recommended screw size
     1/4” x 1” Screw size may vary depending
     on location.

10.  Set your personal combination.
       Enjoy your V-Line Quick Vault.
       For complete concealment
       hang a picture over the Quick Vault.